We use optional first-party traffic analytics to improve the blog. You can accept or decline — nothing is measured before you choose.

Privacy policy

Skip to content
NyverraNyverra
⌘K
HomeArticlesCorporate site
🇺🇸
Nyverra

Editorial channel

Articles on technology, operations and partners — infrastructure, monitoring and critical environments.

Social media

Explore

  • Home
  • Articles
  • Categories
  • Tags
  • Authors
  • About
  • Contact
  • RSS
  • Corporate site

Nyverra

  • Our services
  • Case studies
  • Partners

Contact

Email[email protected]WhatsApp(62) 99309-1592Client portalITSM · tickets and SLA

Rua RB 18, S/N — Casa 01, Sala 01 · Residencial Buriti · Senador Canedo – GO, Brazil · ZIP 75260-459

Hours: Mon–Fri, 8am–6pm

© 2026 Nyverra. All rights reserved.

CNPJ: 61.571.209/0001-08 · State registration: 20.291.265-5 · D-U-N-S®: 57-323-5796

blog.nyverra.com.br

Terms of usePrivacyCookies
Back to top
  1. Home
  2. Articles

Archive

All articles

Browse the full archive of publications from the Nyverra editorial channel.

Refine

Search and filter articles

Browse category indexBrowse tag index
Category
#Disaster Recovery
Sort by

5 articles found

  • RPO vs RTO: How to Define Before Buying Backup (and Why Most Companies Get It Wrong)
    Segurança

    RPO vs RTO: How to Define Before Buying Backup (and Why Most Companies Get It Wrong)

    Most companies buy backup asking the wrong question: "how much does it cost?". The right question is: how much data can I lose (RPO) and how long can I be down (RTO). Discover how to define these numbers per system and avoid purchasing protection based on price, not on real need.

    31 de outubro de 20269 min de leitura
  • Nyverra Portal Releases: Packaging Changes with Traceability
    Tutoriais

    Nyverra Portal Releases: Packaging Changes with Traceability

    A release isn't just “pushing code”: it's grouping the changes that go live together in the same window, with order, status, and deployment records. See how the Releases module of the Nyverra ITSM Portal controls the REL-* cycle from planning to go-live.

    31 de outubro de 20266 min de leitura
  • Change Management in Portal Nyverra: RFC, CAB, and Rollback Plan
    Tutoriais

    Change Management in Portal Nyverra: RFC, CAB, and Rollback Plan

    Every production change carries risk. The Change module of Portal Nyverra ITSM controls the RFC lifecycle — types and risk, approval (with self-approval prohibited), CAB, implementation window, and rollback plan — before the change becomes the next incident.

    31 de outubro de 20267 min de leitura
  • Kubernetes Course 28 — DR and Capstone: Proving the Cluster Comes Back
    Kubernetes

    Kubernetes Course 28 — DR and Capstone: Proving the Cluster Comes Back

    RPO, RTO and real drills: disaster scenarios, runbook, measured restore and the capstone that closes the course with a cluster that recovers.

    31 de outubro de 20265 min de leitura
  • Isac Case: 500,000 Exposed Patients Show Why Data Security Is Top Priority
    Infraestrutura

    Isac Case: 500,000 Exposed Patients Show Why Data Security Is Top Priority

    A ransomware attack on a healthcare facility manager exposed sensitive data of half a million patients and triggered the ANPD's alert. Understand the security failures, what the LGPD requires, and how operations and SRE teams can prevent similar disasters.

    31 de outubro de 20267 min de leitura